Completed CW&F projects
Installation of emergency contact points and upgrade of CCTV across all campuses
As part of an ongoing commitment to the safety and security of staff and students, the University upgraded its security systems across the six UWS campuses in 2012/2013...(read more)
Pilot of the Blended learning initiative in six flat-floor teaching spaces in building EB, Parramatta campus
Over the 2012/2013 intersession break, six flat-floor teaching spaces on level three of building EB were upgraded as part of a pilot program to provide functional, dynamic and collaborative learning spaces for students...(read more)
Construction of new student residences and common room facility, Bankstown campus
In 2012, three three-storey student accommodation blocks (194 beds) were constructed in the south-west corner of the Bankstown campus...(read more)
Precinct 1: forecourt to buildings EA and EB, Parramatta campus
In 2012, a new entry and arrival plaza was developed on the Parramatta south campus...(read more)
Development of additional student residences and common facilities, Hawkesbury campus
120 fully furnished, self-contained studio-style bedrooms were constructed on the Hawkesbury campus in 2012...(read more)
Development of additional student residences, Penrith campus, Kingswood
Three three-storey residential buildings were constructed on Penrith campus, Kingswood, in 2012 to provide an additional 101 beds for students...(read more)

