Campbelltown campus

Completed CW&F projects on Campbelltown campus

Refurbishment of building 18 for Solar Energy Technologies Research Group

Floorplan of building 18 refurbishment for Solar Energies Technologies Research GroupTwo new solar testing laboratories and a dark room have been constructed in building 18 for the Solar Research Group. The new labs complement the existing labs in the building, provide teaching facilities for new solar research academics and students and feature newly purchased solar testing equipment. Uninterrupted Power Supply (UPS) has been provided to the labs to ensure protection of the research equipment.

This project also involved upgrading the entrance to building 18 to provide an identity for the Solar Research Group.

Completed: 20 August 2012

Refurbishment of building 3 for Health Services and Outcomes

Floorplan of building 3 refurbishment for HSOThe office accommodation in building 3 has been refurbished to become the Health Services and Outcomes (HSO) headquarters, consolidating the HSO staff in one building on the campus.

This project also involved relocating the art storage facility in building 3, Campbelltown campus, to building BX on Penrith campus, Werrington South.

Completed: 20 August 2012

Building 24 adaptive reuse and extension for the School of Biomedical Health Sciences

Building 24 adaptive reuse for School of Biomedical Science Allied HealthBuilding 24 on Campbelltown campus has been adapted and extended into a clinical training facility that has three clinical training rooms, a human movement clinical training laboratory, a FutureHealth Smart Space and appropriate support facilities. The new facility will meet the needs of over 770 students per annum and allow for further clinical skills training via distance education.

Completed: 30 May 2012

Building 8 laboratory upgrade

Building 8 laboratory upgradeThe building 8 laboratories have been reconfigured and upgraded to provide four main teaching labs for chemistry, bio-chemistry, physics and biology teaching. A small goods/passenger lift was also installed in building 8 as part of this project.

Completed: 30 March 2012